A good building starts long before the posts are set or the concrete is poured.

For post-frame buildings, shops, barndominiums and other rural construction projects, proper building pad preparation is one of the most important parts of the entire job. Poor site preparation can contribute to drainage problems, settlement, cracking, difficult access and expensive corrections later.

If you are preparing to build in Eastern Nebraska, understanding what happens before construction begins can help you plan the project correctly from the start.

What Is Building Pad Preparation?

Building pad preparation is the process of creating a stable, properly graded area where a structure will be built.

Depending on the property, this can involve:

  • Clearing vegetation, trees or existing structures

  • Removing unsuitable topsoil or organic material

  • Excavation and grading

  • Bringing in suitable fill material

  • Compacting the pad

  • Establishing the proper building elevation

  • Creating positive drainage around the structure

  • Preparing access for construction equipment

  • Coordinating utilities, driveways and drainage improvements

Some sites require relatively little work. Others may require substantial excavation and material movement before construction can begin.

Why Topsoil Usually Cannot Be Built On

One of the first considerations is what lies underneath the proposed building.

Topsoil contains organic material and is generally not the material you want supporting a slab or structural building pad. Depending on site conditions, unsuitable material may need to be stripped before suitable fill is placed.

Simply leveling the visible ground is not the same as preparing a building pad.

The goal is to create a stable base capable of supporting the planned structure and concrete work.

Building Elevation Matters

Before excavation begins, the building elevation should be considered carefully.

Setting a building too low can create drainage problems. Setting it higher may require additional fill, longer approaches or changes to the driveway.

The surrounding property matters just as much as the building footprint.

Water should move away from the building instead of toward it.

On rural Nebraska properties, the final elevation may also need to account for:

  • Existing roads and driveways

  • Nearby buildings

  • Low areas

  • Natural drainage patterns

  • Culverts and ditches

  • Future additions

  • Septic systems

  • Well locations

  • Utility routes

Planning these items together is usually much easier than trying to correct them after construction.

Excavation and Grading

Once the building location and elevation are established, excavation and grading can begin.

The amount of work varies considerably from property to property.

A relatively flat lot may only require stripping and minor grading. A sloped or undeveloped acreage may require considerably more work to establish the building pad.

Good grading should accomplish more than simply making the site look level.

It should create a usable construction area while also controlling how water moves across the property.

Fill and Compaction

If the building pad needs to be raised, suitable fill may need to be imported or redistributed from elsewhere on the property.

How the material is placed is important.

Large amounts of loose fill placed without proper compaction can create future settlement problems. Fill is generally placed and compacted in controlled lifts rather than simply dumped into place.

Site conditions, soils and the amount of fill required all affect how a pad should be constructed.

This is especially important beneath concrete slabs and areas that will carry heavy vehicles or equipment.

Drainage Should Be Planned Before the Building Goes Up

Drainage is often treated as something to address after construction.

That can be an expensive mistake.

Building pad preparation is the ideal time to determine where water should go.

Depending on the property, that may involve:

  • Establishing positive grade away from the building

  • Swales

  • Culverts

  • Ditches

  • Drainage pipes

  • Changes to driveway elevation

  • Managing runoff from roofs and parking areas

  • Stabilizing areas where concentrated water will flow

The goal is not simply to move water away from the building. It is to move it somewhere that will not create another problem.

Don't Forget Construction Access

The building site also needs to be accessible during construction.

Concrete trucks, material deliveries, cranes, lifts and other equipment may need to reach the structure.

On undeveloped acreage, temporary or permanent access may need to be established before the building crew arrives.

Thinking about the driveway and construction entrance early can prevent delays and help avoid unnecessary damage to the property.

Utilities Should Be Coordinated With Site Work

If the project will include electric, water, septic, sewer or other underground utilities, it is smart to consider those routes during the excavation phase.

For a new shop or barndominium, the site plan may need to accommodate:

  • Electrical service

  • Water lines

  • Well location

  • Septic system

  • Sewer connection where available

  • Propane or natural gas

  • Communications

  • Future outbuildings

Planning everything together can reduce duplicated excavation and make the final property layout more practical.

Building Pad Preparation for Post-Frame Shops

Post-frame buildings can often accommodate a wide variety of sites, but good preparation still matters.

The pad should provide adequate working room around the future structure and should be properly graded for the planned floor elevation.

It is also important to consider whether the project will include:

  • A full concrete slab

  • Exterior aprons

  • Driveways

  • Large overhead doors

  • Heavy equipment storage

  • Floor drains

  • Future additions

A 40×60 equipment shop has different site demands than a small detached garage.

Building Pad Preparation for Barndominiums

Barndominiums usually require more comprehensive site planning because the building is also a residence.

In addition to the building pad itself, the project may involve:

  • Septic system design and installation

  • Well construction

  • Utility service

  • Driveway access

  • Garage and shop approaches

  • Porches and patios

  • Drainage

  • Future landscaping

For raw acreage, these site-development costs should be considered early when establishing the overall project budget.

Can Mid-Plains Handle the Site Work and the Building?

Yes.

Mid-Plains Building Solutions provides excavation, site development and building construction for projects throughout Eastern Nebraska.

Having the site work and building scope coordinated can simplify the project because decisions about elevation, drainage, concrete and building layout can be made together rather than by several contractors working independently.

Planning a Building in Eastern Nebraska?

Whether you are preparing for a post-frame shop, barndominium, garage, agricultural building or another structure, the condition of the site plays a major role in the success of the project.

Mid-Plains Building Solutions can evaluate the property, discuss the planned building and determine what site preparation may be needed before construction begins.

Planning a building on developed or undeveloped property? Contact Mid-Plains Building Solutions to discuss the building, excavation and site-development scope together.


SEO title: Building Pad Preparation Nebraska | What Happens Before Construction


URL slug: building-pad-preparation-nebraska


Focus keyword: building pad preparation Nebraska


Meta description: Planning a new shop, barndominium or post-frame building? Learn what goes into building pad preparation in Nebraska, from clearing and grading to drainage and compaction.

 
 
 

Comments


© 2021 by Mid-Plains Building Solutions. All rights reserved.

  • Facebook
  • Linkedin
bottom of page